Meldreth Road level crossing

Automatic half-barrier level crossing on the Anglia route (ELR SBR).

right now
OPEN
for 19 min
next: 🚄 in 21 min · 1 min late

Next 30 min

OPEN 01:15–01:34 19m
CLOSED 01:34–01:36 2m
OPEN 01:36–03:15+ 1h+
Under the hood
Fri 24 Jul · 01:15
Today Tomorrow

Trains in window

01:30 3S20 🚧 BROXGBF → BROXGBF → from Shepreth Branch Jn no show
01:36 1C76 🚄 KNGX → CAMBDGE ← from Barrington PAD GBRF +1 min
🚄Express passenger 🚧Engineering
now 01:15:32 · 381 avg · 2 in window
lx berths down: CA/0107→CA/[email protected] · up: CA/0108→CA/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,126 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Meldreth Road crossing is predicted to be closed for about 9 h 6 min between 06:00 and 22:00, across roughly 157 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:01–00:02, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:01–08:01 in the morning and around 18:57–19:57 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Meldreth Road is a automatic half-barrier crossing (AHB) on the Barrington PAD GBRF–Shepreth Branch Jn line (Anglia route · ELR SBR). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,140 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 96.0% of the warnings we could verify came true.

Typical timing error was ±38s (9 in 10 within 107s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?