Haverigg level crossing

Automatic half-barrier level crossing on the North West route (ELR CBC1).

predicted
OPEN
for 28 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 29 min · on time

Next 30 min

OPEN 06:52–07:20 28m
CLOSED 07:20–07:21 2m
OPEN 07:21–08:08 → 47m
Under the hood
Mon 12 Oct · 06:52
Today Tomorrow

Trains in window

07:21 🚆 2T37 Barrow-in-Furness → Corkickle Down (E → W) on time
🚆Passenger
now 06:52:12 · 26 avg · 1 in window
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,656 active · 24,602 delays · 2,504 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Haverigg crossing is predicted to be closed for about 46 min between 06:00 and 22:00, across roughly 18 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:03–10:03 in the morning and around 14:39–15:39 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Millom, Cumbria.

Haverigg is a automatic half-barrier crossing (AHB) on the Barrow-in-Furness–Sellafield B.N.F. line (North West route · ELR CBC1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?