Kenardington level crossing

Automatic half-barrier level crossing on the Kent route (ELR ATH).

predicted
OPEN
for 19 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 20 min · running

Next 30 min

OPEN 07:12–07:31 19m
CLOSED 07:31–07:33 2m
OPEN 07:33–07:54 → 21m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:32 🚆 2D07 Ashford InternationalEastbourne Down (NE → SW) active
🚆Passenger
now 07:12:34 · 42 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,042 delays · 3,032 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Kenardington crossing is predicted to be closed for about 1 h 37 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (05:52–05:54, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:34–11:34 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Kenardington is a automatic half-barrier crossing (AHB) on the Ashford International–Rye line (Kent route · ELR ATH). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 227 trains through this crossing.

99.1% of observed passes were being warned about on this page when they passed, and 98.2% of the warnings we could verify came true.

Typical timing error was ±8s (9 in 10 within 29s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?