Automatic half-barrier level crossing on the Kent route (ELR ATH).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:58 | 🚆 2D18 | Eastbourne → Ashford International Up (SW → NE) | passed |
On today’s timetable, Warehorne crossing is predicted to be closed for about 1 h 18 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 1.5 min (05:53–05:55, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 06:00–07:00 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Church Road in Warehorne, Kent.
Warehorne is a automatic half-barrier crossing (AHB) on the Ashford International–Rye line (Kent route · ELR ATH). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 265 trains through this crossing.
98.1% of observed passes were being warned about on this page when they passed, and 99.2% of the warnings we could verify came true.