Manually-controlled barrier with obstacle detection level crossing on the Scotland route (ELR ECA2).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:51 | π 2Y67 | Edinburgh β Glasgow Central High Level Up (NE β SW) | +1 min |
| 09:55 | π 1Y76 | Glasgow Central High Level β Edinburgh Down (SW β NE) | on time |
| 09:59 | π 1S36 | Birmingham New Street β Edinburgh Down (SW β NE) | passed |
| 10:00 | π 4S95 | Tees Dock BSC Export Berth β Grangemouth TDG Up (NE β SW) | approaching |
| 10:12 | π 1Y77 | Edinburgh β Glasgow Central High Level Up (NE β SW) | active |
| 10:17 | π 2Y48 | Glasgow Central High Level β Edinburgh Down (SW β NE) | -1 min |
| 10:25 | π 1M85 | Edinburgh β Manchester Airport Up (NE β SW) | active |
On todayβs timetable, Kirknewton crossing is predicted to be closed for about 7 h 55 min between 06:00 and 22:00, across roughly 95 closures. The longest single predicted closure is 9 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 8.9 min (08:02–08:11, 3 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 07:52β08:52 in the morning and around 17:45β18:45 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Station Road in Kirknewton, West Lothian, next to the station.
Kirknewton is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the FauldhouseβHaymarket line (Scotland route · ELR ECA2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway: over the last 7 days that covered 841 trains through this crossing.
99.9% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.
Typical timing error was Β±17s (9 in 10 within 125s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.