Auchengray level crossing

Automatic half-barrier level crossing on the Scotland route (ELR ECA2).

predicted
OPEN
for 22 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 23 min · 2 min late

Next 30 min

OPEN 16:49–17:11 22m
CLOSED 17:11–17:14 3m
OPEN 17:14–18:18 → 64m
Under the hood
Thu 08 Oct · 16:49
Today Tomorrow

Trains in window

16:41 🚄 1C60 Glasgow Central High Level → Edinburgh Down +8 min
17:13 🚄 1S66 Manchester Airport → Edinburgh Down approaching
17:14 🚄 9M60 Edinburgh → London Euston Up active
🚄Express passenger
now 16:49:43 · 68 avg · 3 in window
live observation: 2 up · 2 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,614 active · 32,041 delays · 2,180 cancelled · 0 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Auchengray crossing is predicted to be closed for about 1 h 50 min between 06:00 and 22:00, across roughly 42 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.9 min (09:13–09:15, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:26–07:26 in the morning and around 18:19–19:19 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Auchengray is a automatic half-barrier crossing (AHB) on the Carstairs East Jn–Haymarket line (Scotland route · ELR ECA2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 455 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±2s (9 in 10 within 24s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?