Logans Road level crossing

CCTV-monitored manual barrier level crossing on the Scotland route (ELR WCM2).

predicted
OPEN
for 18 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 21 min · 1 min late

Next 30 min

OPEN 09:59–10:16 18m
CLOSED 10:16–10:20 3m
OPEN 10:20–10:48 → 29m
Under the hood
Thu 22 Oct · 09:59
Today Tomorrow

Trains in window

09:52 🚄 1M10 Glasgow Central High Level → London Euston Up (NW → SE) +1 min
09:56 🚄 9M53 Glasgow Central High Level → London Euston Up (NW → SE) passed
10:19 🚄 1S35 Manchester Airport → Glasgow Central High Level Down (SE → NW) +1 min
🚄Express passenger
now 09:59:04 · 89 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active · 31,698 delays · 1,962 cancelled · 9 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Logans Road crossing is predicted to be closed for about 4 h 45 min between 06:00 and 22:00, across roughly 59 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.2 min (07:13–07:19, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:48–08:48 in the morning and around 16:03–17:03 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Logans Road in Forgewood, North Lanarkshire.

Logans Road is a CCTV-monitored manual barrier crossing (CCTV) on the Motherwell–Uddingston line (Scotland route · ELR WCM2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 547 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Typical timing error was ±38s (9 in 10 within 141s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?