Lissingley level crossing

Automatic half-barrier level crossing on the East Midlands route (ELR NOB3).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 04:55–05:51 → 56m
Under the hood
Mon 07 Sep · 04:55
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 04:55:39 · 23 avg · 0 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 48,718 active · 21,561 delays · 2,954 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Lissingley crossing is predicted to be closed for about 55 min between 06:00 and 22:00, across roughly 19 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:14–07:14 in the morning and around 13:58–14:58 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Lissingley is a automatic half-barrier crossing (AHB-X) on the Barnetby Sdgs Colas Rail–Lincoln line (East Midlands route · ELR NOB3). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?