Littleport level crossing

Manual gate level crossing on the Anglia route (ELR BGK).

predicted
OPEN
for 14 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 17 min · 19 min late

Next 30 min

OPEN 07:13–07:26 14m
CLOSED 07:26–07:30 3m
OPEN 07:30–07:35 6m
CLOSED 07:35–07:42 6m
OPEN 07:42–08:05 → 24m
Under the hood
Mon 07 Sep · 07:13
Today Tomorrow

Trains in window

07:09 🚄 1T09 Kings LynnLondon Kings Cross Up (N → S) passed
07:29 🚄 1T02 London Kings CrossKings Lynn Down (S → N) +19 min
07:38 🚄 1T11 Kings LynnLondon Kings Cross Up (N → S) on time
07:41 🚄 1T94 London Kings CrossKings Lynn Down (S → N) +3 min
🚄Express passenger
now 07:13:20 · 52 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,152 active · 25,064 delays · 3,032 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Littleport crossing is predicted to be closed for about 2 h 35 min between 06:00 and 22:00, across roughly 25 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.9 min (06:04–06:09, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:12–07:12 in the morning and around 17:15–18:15 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Littleport is a manual gate crossing (MGH) on the Ely–Downham Market line (Anglia route · ELR BGK). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 106 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 86.3% of the warnings we could verify came true.

Typical timing error was ±4s (9 in 10 within 91s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?