Lostwithiel level crossing

Manually-controlled barrier level crossing on the Western route (ELR MLN3).

predicted
OPEN
for 17 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 19 min · on time

Next 30 min

OPEN 11:09–11:25 17m
CLOSED 11:25–11:28 3m
OPEN 11:28–11:55 → 27m
Under the hood
Mon 07 Sep · 11:09
Today Tomorrow

Trains in window

10:59 🚆 2C11 PlymouthPenzance Down (NE → SW) cancelled
11:01 🚆 2P09 PenzancePlymouth Up (SW → NE) +3 min
11:28 🚆 2C14 Exeter St. David'sPenzance Down (NE → SW) on time
11:28 🚄 1A84 PenzanceLondon Paddington Up (SW → NE) on time
🚄Express passenger 🚆Passenger
now 11:09:08 · 76 avg · 4 in window
live observation: 4 up · 6 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,728 active · 30,422 delays · 3,239 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Lostwithiel crossing is predicted to be closed for about 3 h 54 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 4.8 min (09:55–10:00, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:59–08:59 in the morning and around 17:28–18:28 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Lostwithiel is a manually-controlled barrier crossing (MCB/MB) on the Bodmin Parkway–Par line (Western route · ELR MLN3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 465 trains through this crossing.

99.8% of observed passes were being warned about on this page when they passed, and 97.3% of the warnings we could verify came true.

Typical timing error was ±27s (9 in 10 within 240s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?