Liskeard level crossing

Signal-box-controlled level crossing on the Western route (ELR MLN3).

right now
OPEN
for at least 2h

Next 30 min

OPEN 02:04–04:04+ 2h+
Under the hood
Fri 24 Jul · 02:04
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 02:04:38 · 119 avg · 0 in window
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,100 active · 30,165 delays · 1,822 cancelled · 0 reconnects
Nearby crossings

All 228 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Liskeard crossing is predicted to be closed for about 6 h 1 min between 06:00 and 22:00, across roughly 72 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 12:42–13:42 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Liskeard is a signal-box-controlled crossing (SBC) on the Plymouth–Looe line (Western route · ELR MLN3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?