Liskeard level crossing

Signal-box-controlled level crossing on the Western route (ELR MLN3).

predicted
OPEN
for 18 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 21 min · 1 min late

Next 30 min

OPEN 07:12–07:30 18m
CLOSED 07:30–07:33 3m
OPEN 07:33–07:38 5m
CLOSED 07:38–07:41 3m
OPEN 07:41–07:56 → 15m
Under the hood
Mon 07 Sep · 07:12
Today Tomorrow

Trains in window

07:06 🚆 2C02 PlymouthPenzance Down (E → W) on time
07:07 🚆 2E02 PenzanceExeter St. David's Up (W → E) cancelled
07:21 🚃 5L73 PlymouthLiskeard Down (E → W) no show
07:33 🚄 1A76 PenzanceLondon Paddington Up (W → E) +1 min
07:41 🚆 2C03 Exeter St. David'sPenzance Down (E → W) +2 min
🚄Express passenger 🚆Passenger 🚃Empty stock
now 07:12:09 · 80 avg · 5 in window
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,149 active · 25,036 delays · 3,031 cancelled · 0 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Liskeard crossing is predicted to be closed for about 4 h 59 min between 06:00 and 22:00, across roughly 63 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:19–08:19 in the morning and around 17:20–18:20 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Liskeard is a signal-box-controlled crossing (SBC) on the Plymouth–Looe line (Western route · ELR MLN3). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?