Lowdham level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR NOB1).

predicted
CLOSED
for 4 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 4 min · 7 min late

Next 30 min

CLOSED 02:11–02:15 4m
OPEN 02:15–02:22 8m
CLOSED 02:22–02:26 3m
OPEN 02:26–04:11+ 1h+
Under the hood
Thu 15 Oct · 02:11
Today Tomorrow

Trains in window

02:15 🚛 6E68 Kingsbury Oil Sdgs → Lindsey Oil Refinery Down (SW → NE) +7 min
02:25 🚧 3J88 Sandiacre Ballast Sidings → Toton North Jn Down (SW → NE) approaching
🚛Freight 🚧Engineering
now 02:11:39 · 83 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-14..2026-10-16
fetched 02:08:21
trust 32,442 active · 31,157 delays · 1,734 cancelled · 9 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Lowdham crossing is predicted to be closed for about 4 h 42 min between 06:00 and 22:00, across roughly 53 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (23:59–00:02, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:52–09:52 in the morning and around 16:36–17:36 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Lowdham, Nottinghamshire, next to the station.

Lowdham is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Nottingham–Thurgarton line (East Midlands route · ELR NOB1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 485 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.3% of the warnings we could verify came true.

Full accuracy report →

Is this right?