Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR NOB1).

predicted
CLOSED
for 2 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 2 min Β· on time

Next 30 min

CLOSED 06:12–06:14 2m
OPEN 06:14–06:28 14m
CLOSED 06:28–06:30 3m
OPEN 06:30–06:43 β†’ 13m
Under the hood
Wed 11 Nov Β· 06:12
Today Tomorrow

Trains in window

06:14 πŸš† 2T90 Lincoln β†’ Nottingham Up (NE β†’ SW) on time
06:26 πŸš› 4O92 Doncaster Europort β†’ Southampton M.C.T. Up (NE β†’ SW) no show
06:30 πŸšƒ 5K55 Nottingham β†’ Newark Castle Down (SW β†’ NE) active
πŸš†Passenger πŸšƒEmpty stock πŸš›Freight
now 06:12:28 Β· 83 avg Β· 3 in window
live observation: 2 up Β· 1 down
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,682 active Β· 31,188 delays Β· 1,995 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Bleasby crossing is predicted to be closed for about 3 h 53 min between 06:00 and 22:00, across roughly 53 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 5.3 min (02:12–02:18, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:45–09:45 in the morning and around 16:19–17:19 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Bleasby, Nottinghamshire, next to the station.

Bleasby is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Nottingham–Fiskerton line (East Midlands route · ELR NOB1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 471 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 97.7% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?