Rolleston Station level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR NOB1).

predicted
OPEN
for 14 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 17 min · on time

Next 30 min

OPEN 16:55–17:08 14m
CLOSED 17:08–17:12 3m
MAY OPEN 17:12–17:13 1m
CLOSED 17:13–17:16 3m
OPEN 17:16–17:48 → 32m
Under the hood
Thu 08 Oct · 16:55
Today Tomorrow

Trains in window

16:52 🚆 2A30 Lincoln → Matlock Down (SW → NE) +2 min
16:54 🚄 1N66 Crewe → Lincoln Up (NE → SW) on time
17:12 🚆 2N67 Matlock → Lincoln Up (NE → SW) on time
17:16 🚄 1K75 Lincoln → Crewe Down (SW → NE) +2 min
🚄Express passenger 🚆Passenger
now 16:55:20 · 83 avg · 4 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,618 active · 32,043 delays · 2,180 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Rolleston Station crossing is predicted to be closed for about 4 h 23 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.6 min (08:50–08:57, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:45–09:45 in the morning and around 12:14–13:14 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Rolleston Station is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Nottingham–Rolleston line (East Midlands route · ELR NOB1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 471 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.4% of the warnings we could verify came true.

Typical timing error was ±91s (9 in 10 within 118s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?