Signal-box-controlled level crossing on the Wessex route (ELR WEY).
| No trains in the next 30 minutes. |
On today’s timetable, Maiden Newton crossing is predicted to be closed for about 56 min between 06:00 and 22:00, across roughly 11 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:00–08:00 in the morning and around 19:57–20:57 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Maiden Newton is a signal-box-controlled crossing (SBC) on the Yeovil Pen Mill–Weymouth line (Wessex route · ELR WEY). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →