Markle level crossing

Automatic half-barrier level crossing on the Scotland route (ELR ECM8).

predicted
OPEN
for 15 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 16 min Β· running

Next 30 min

OPEN 09:58–10:12 15m
CLOSED 10:12–10:14 2m
OPEN 10:14–10:17 4m
CLOSED 10:17–10:20 3m
OPEN 10:20–10:22 2m
CLOSED 10:22–10:25 3m
OPEN 10:25–10:29 β†’ 3m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

10:14 πŸš„ 1E10 Edinburgh β†’ London Kings Cross Up (W β†’ E) active
10:19 πŸš„ 1V58 Edinburgh β†’ Plymouth Up (W β†’ E) active
10:20 πŸš„ 1S03 London Kings Cross β†’ Aberdeen Down (E β†’ W) approaching
10:23 πŸš„ 9N10 Edinburgh β†’ Newcastle Up (W β†’ E) active
10:25 πŸš„ 1S04 London Kings Cross β†’ Edinburgh Down (E β†’ W) +7 min
πŸš„Express passenger
now 09:58:11 Β· 164 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,697 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway β†’

About this crossing

How often it closes

On today’s timetable, Markle crossing is predicted to be closed for about 4 h 21 min between 06:00 and 22:00, across roughly 89 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.8 min (07:10–07:14, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 10:03–11:03 in the morning and around 15:27–16:27 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Markle, East Lothian.

Markle is a automatic half-barrier crossing (AHB) on the Dunbar–Millerhill S.S. line (Scotland route · ELR ECM8). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 927 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Typical timing error was Β±2s (9 in 10 within 7s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?