User-worked with stop lights level crossing on the Wales route (ELR SHL).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 07:15 | 🚄 1W91 | Cardiff Central → Holyhead Up (S → N) | +3 min |
| 07:25 | 🚆 2M02 | Llandrindod → Shrewsbury Up (S → N) | +1 min |
| 07:41 | 🚄 1W12 | Cardiff Central → Manchester Piccadilly Up (S → N) | +5 min |
| 07:43 | 🚄 1V90 | Holyhead → Cardiff Central Down (N → S) | +14 min |
| 07:46 | 🚃 5W99 | Canton C.S.D. → Crewe T.M.D. (Electric) Up (S → N) | no reports |
On today’s timetable, New House Farm crossing is predicted to be closed for about 1 h 57 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:41–09:41 in the morning and around 18:42–19:42 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
New House Farm is a user-worked with stop lights crossing (UWCMSL) on the Sutton Bridge Jn–Hereford line (Wales route · ELR SHL). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →