Manual gate level crossing on the North and East route (ELR PSE).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:56 | π 2D07 | Worksop β Nottingham Up (N β S) | +1 min |
| 09:58 | π§ 3J84 | Toton North Jn β Sandiacre Ballast Sidings Down (S β N) | +11 min |
| 10:10 | π§ 6J98 | Doncaster Up Decoy GBRF β Shirebrook Davis & Son Up (N β S) | no show |
| 10:10 | π§ 6J98 | Doncaster Down Decoy GBRF β Shirebrook Davis & Son Up (N β S) | no show |
| 10:21 | π 2W07 | Nottingham β Worksop Down (S β N) | +2 min |
On todayβs timetable, Norwood crossing is predicted to be closed for about 2 h 18 min between 06:00 and 22:00, across roughly 32 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:16β09:16 in the morning and around 12:16β13:16 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is on Mag Lane near Whaley Thorns, Derbyshire.
Norwood is a manual gate crossing (MGH) on the Mansfield WoodhouseβCreswell (Derbys) line (North and East route · ELR PSE). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β