Onibury level crossing

Manually-controlled barrier level crossing on the Wales route (ELR SHL).

predicted
OPEN
for 12 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 15 min Β· 12 min late

Next 30 min

OPEN 09:58–10:10 12m
CLOSED 10:10–10:14 3m
OPEN 10:14–10:27 13m
CLOSED 10:27–10:30 β†’ 3m
Under the hood
Thu 22 Oct Β· 09:58
Today Tomorrow

Trains in window

09:52 ❓ 0V07 Basford Hall Yard β†’ Stoke Gifford FHH Down (NW β†’ SE) cancelled
10:13 πŸš„ 1V37 Manchester Piccadilly β†’ Cardiff Central Down (NW β†’ SE) +12 min
10:30 πŸš„ 1W55 Cardiff Central β†’ Manchester Piccadilly Up (SE β†’ NW) +1 min
πŸš„Express passenger ❓Other
now 09:58:56 Β· 75 avg Β· 3 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active Β· 31,698 delays Β· 1,962 cancelled Β· 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western β†’

About this crossing

How often it closes

On today’s timetable, Onibury crossing is predicted to be closed for about 3 h 44 min between 06:00 and 22:00, across roughly 50 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 09:03–10:03 in the morning and around 16:49–17:49 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the A49 in Onibury, Shropshire.

Onibury is a manually-controlled barrier crossing (MCB/MB) on the Craven Arms–Hereford line (Wales route · ELR SHL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?