Pyewipe Road level crossing

Manual gate level crossing on the North and East route (ELR PYE2).

right now
OPEN
for at least 2h

Next 30 min

OPEN 01:11–03:11+ 2h+
Under the hood
Fri 24 Jul · 01:11
Today Tomorrow

Trains in window

No trains in the next 30 minutes.
now 01:11:11 · 0 avg · 0 in window
lx berths up: Y0/0972→Y0/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,123 delays · 1,793 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Pyewipe Road crossing is predicted to be closed for about 0 min between 06:00 and 22:00, across roughly 0 closures. The longest single predicted closure is 0 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

No pronounced peak — closures are spread through the day.

About this crossing

Pyewipe Road is a manual gate crossing (MGW) on the Tioxide Siding–Immingham Sorting Sidings line (North and East route · ELR PYE2). A signaller or crossing keeper closes the gates across the road ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 35 trains through this crossing.

97.1% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±33s (9 in 10 within 37s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?