CCTV-monitored manual barrier level crossing on the Kent route (ELR TTH).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Riverhall crossing is predicted to be closed for about 4 h 21 min between 06:00 and 22:00, across roughly 56 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 3.2 min (00:04–00:07, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:45–10:45 in the morning and around 18:25–19:25 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Riverhall is a cctv-monitored manual barrier crossing (CCTV) on the Robertsbridge–Battle line (Kent route · ELR TTH). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 497 trains through this crossing.
98.8% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.
Typical timing error was ±2s (9 in 10 within 52s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.