Rowston level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Midlands route (ELR SPD2).

predicted
OPEN
for 8 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 11 min · 5 min late

Next 30 min

OPEN 17:39–17:47 8m
CLOSED 17:47–17:51 3m
OPEN 17:51–18:17 → 26m
Under the hood
Thu 08 Oct · 17:39
Today Tomorrow

Trains in window

17:36 🚆 2K23 Lincoln → Peterborough Up (N → S) on time
17:39 🚆 2K24 Peterborough → Lincoln Down (S → N) passed
17:50 🚛 4E39 Tilbury Container SRVS GB → Wakefield Europort GBRF Down (S → N) approaching
17:54 🚛 4H00 Doncaster Iport GBRF → Peterborough North Yd GBRf Up (N → S) no show
18:12 🚛 4E20 Felixstowe South GBRF → Masborough N&W GBRF Down (S → N) no show
🚆Passenger 🚛Freight
now 17:39:57 · 95 avg · 5 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,673 active · 32,052 delays · 2,190 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Rowston crossing is predicted to be closed for about 1 h 57 min between 06:00 and 22:00, across roughly 21 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 10.0 min (12:32–12:42, 3 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:20–08:20 in the morning and around 16:50–17:50 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Rowston is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Peterborough North Yd GBRf–Lincoln line (East Midlands route · ELR SPD2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 377 trains through this crossing.