User-worked with stop lights level crossing on the Wessex route (ELR BML2).
| No trains in the next 30 minutes. |
On today’s timetable, Rushton No.2 crossing is predicted to be closed for about 0 min between 06:00 and 22:00, across roughly 0 closures. The longest single predicted closure is 0 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
No pronounced peak — closures are spread through the day.
Rushton No.2 is a user-worked with stop lights crossing (UWCMSL) on the Wareham–Weymouth line (Wessex route · ELR BML2). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →