CCTV-monitored manual barrier level crossing on the Sussex route (ELR BLI1).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| 05:12 | 🚆 2S02 | Brighton → Portsmouth Harbour Down (E → W) | active |
| 05:28 | 🚄 1N02 | Brighton → Southampton Central Down (E → W) | active |
On today’s timetable, Shoreham Station crossing is predicted to be closed for about 10 h 53 min between 06:00 and 22:00, across roughly 126 closures. The longest single predicted closure is 10 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Longest closure so far today: 5.8 min (00:12–00:18, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.
Closures cluster around 09:48–10:48 in the morning and around 13:06–14:06 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Shoreham Station is a cctv-monitored manual barrier crossing (CCTV) on the Hove–Worthing line (Sussex route · ELR BLI1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 1,370 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 98.7% of the warnings we could verify came true.
Typical timing error was ±116s (9 in 10 within 247s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.