Portslade level crossing

CCTV-monitored manual barrier level crossing on the Sussex route (ELR BLI1).

right now
CLOSED
for 4 min
next: 🚆 in 4 min · on time

Next 30 min

CLOSED 00:15–00:20 4m
OPEN 00:20–00:28 8m
CLOSED 00:28–00:35 8m
OPEN 00:35–00:56 → 21m
Under the hood
Fri 24 Jul · 00:15
Today Tomorrow

Trains in window

00:19 2T94 🚆 BRGHTN → WWRTHNG ← from Hove approaching
00:29 1H96 🚄 VICTRIC → WORTHNG ← from Hove no show
00:31 5T93 🚃 WWRTHNG → LOVRSWS → from Southwick active
00:35 5H95 🚃 WORTHNG → LOVRSWS → from Southwick active
00:35 2S95 🚆 PHBR → BRGHTN → from Southwick +11 min
00:41 3S97 🚧 HORSHUS → HORSHUS → from Southwick no show
🚄Express passenger 🚆Passenger 🚃Empty stock 🚧Engineering
now 00:15:49 · 233 avg · 6 in window
lx berths down: LA/0003→LA/[email protected] · up: LA/0004→LA/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,036 active · 29,996 delays · 1,739 cancelled · 0 reconnects
Nearby crossings

All 236 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Portslade crossing is predicted to be closed for about 10 h 34 min between 06:00 and 22:00, across roughly 109 closures. The longest single predicted closure is 14 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.2 min (23:57–00:03, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:19–08:19 in the morning and around 13:03–14:03 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Portslade is a cctv-monitored manual barrier crossing (CCTV) on the Hove–Southwick line (Sussex route · ELR BLI1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 1,408 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.1% of the warnings we could verify came true.

Typical timing error was ±43s (9 in 10 within 99s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?