Spatham Lane level crossing

Automatic half-barrier level crossing on the Sussex route (ELR KJE1).

right now
OPEN
for 1 min
next: 🚄 in 3 min · on time

Next 30 min

OPEN 01:14–01:15 1m
CLOSED 01:15–01:16 2m
OPEN 01:16–03:14+ 1h+
Under the hood
Fri 24 Jul · 01:14
Today Tomorrow

Trains in window

01:16 1F72 🚄 HYWRDSH → EBOURNE ← from Haywards Heath on time
🚄Express passenger
now 01:14:05 · 94 avg · 1 in window
lx berths up: TB/0642→TB/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,125 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 236 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Spatham Lane crossing is predicted to be closed for about 2 h 40 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:42–00:43, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 09:14–10:14 in the morning and around 19:48–20:48 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Spatham Lane is a automatic half-barrier crossing (AHB) on the Haywards Heath–Plumpton line (Sussex route · ELR KJE1). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 239 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.

Typical timing error was ±39s (9 in 10 within 83s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?