Manually-controlled barrier with obstacle detection level crossing on the Sussex route (ELR KJE1).
Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.
| No trains in the next 30 minutes. |
On today’s timetable, Plumpton crossing is predicted to be closed for about 4 h 20 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 3 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 09:13–10:13 in the morning and around 17:13–18:13 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Plumpton is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Haywards Heath–Lewes line (Sussex route · ELR KJE1). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
We score this page against what actually happened on the railway — over the last 7 days that covered 366 trains through this crossing.
100.0% of observed passes were being warned about on this page when they passed, and 97.1% of the warnings we could verify came true.
Typical timing error was ±197s (9 in 10 within 738s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.