Stewartby Brickworks level crossing

CCTV-monitored manual barrier level crossing on the West Coast South route (ELR BBM).

predicted
OPEN
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 4 min · 2 min late

Next 30 min

OPEN 07:41–07:42 1m
CLOSED 07:42–07:45 3m
OPEN 07:45–08:18 → 33m
Under the hood
Tue 06 Oct · 07:41
Today Tomorrow

Trains in window

07:45 🚆 2S05 Bletchley → Bedford Down (SW → NE) +2 min
🚆Passenger
now 07:41:17 · 48 avg · 1 in window
live observation: 1 up · 2 down
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,429 active · 31,723 delays · 1,702 cancelled · 0 reconnects
Nearby crossings

All 148 crossings in North West and Central →

About this crossing

How often it closes

On today’s timetable, Stewartby Brickworks crossing is predicted to be closed for about 2 h 26 min between 06:00 and 22:00, across roughly 35 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (06:18–06:21, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:13–07:13 in the morning and around 19:14–20:14 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Stewartby Brickworks is a cctv-monitored manual barrier crossing (CCTV) on the Bletchley–Up line (West Coast South route · ELR BBM). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 110 trains through this crossing.

98.2% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±41s (9 in 10 within 588s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →