Stockbridge Road level crossing

CCTV-monitored manual barrier level crossing on the Sussex route (ELR TBH2).

predicted
OPEN
for the next 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 01:32–02:40 → 69m
Under the hood
Fri 13 Nov · 01:32
Today Tomorrow

Trains in window

01:31 🚃 5S79 Havant → Littlehampton Up (W → E) passed
🚃Empty stock
now 01:32:12 · 237 avg · 1 in window
live observation: 3 up · 1 down
timetable cif full+upd 2026-11-11..2026-11-13
fetched 02:08:16
trust 33,890 active · 31,398 delays · 2,585 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Stockbridge Road crossing is predicted to be closed for about 9 h 49 min between 06:00 and 22:00, across roughly 105 closures. The longest single predicted closure is 12 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.6 min (00:19–00:26, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:43–07:43 in the morning and around 14:18–15:18 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Stockbridge Road in Chichester, West Sussex, next to the station.

Stockbridge Road is a CCTV-monitored manual barrier crossing (CCTV) on the Barnham–Chichester Reception line (Sussex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 1,333 trains through this crossing.

99.9% of observed passes were being warned about on this page when they passed, and 98.9% of the warnings we could verify came true.

Typical timing error was ±16s (9 in 10 within 63s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?