Whyke Road level crossing

CCTV-monitored manual barrier level crossing on the Sussex route (ELR TBH2).

predicted
OPEN
for 20 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 in 23 min · scheduled

Next 30 min

OPEN 02:19–02:39 20m
CLOSED 02:39–02:42 3m
OPEN 02:42–03:05 → 23m
Under the hood
Fri 13 Nov · 02:19
Today Tomorrow

Trains in window

02:42 🚃 5N98 Littlehampton → Havant Down (E → W) sched
🚃Empty stock
now 02:19:12 · 198 avg · 1 in window
live observation: 1 up · 0 down
timetable cif full+upd 2026-11-12..2026-11-14
fetched 02:08:19
trust 32,650 active · 30,817 delays · 2,096 cancelled · 0 reconnects
Nearby crossings

All 234 crossings in Southern →

About this crossing

How often it closes

On today’s timetable, Whyke Road crossing is predicted to be closed for about 10 h 2 min between 06:00 and 22:00, across roughly 103 closures. The longest single predicted closure is 16 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.6 min (00:19–00:26, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:26–07:26 in the morning and around 14:00–15:00 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Whyke Road in Chichester, West Sussex.

Whyke Road is a CCTV-monitored manual barrier crossing (CCTV) on the Barnham–Chichester Reception line (Sussex route · ELR TBH2). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 729 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.9% of the warnings we could verify came true.

Full accuracy report →