Strathcarron level crossing

Automatic open level crossing with barriers level crossing on the Scotland route (ELR KYL).

predicted
CLOSED
for 15s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 now · 2 min late

Next 30 min

CLOSED 09:59–09:59 15s
OPEN 09:59–11:59+ 2h+
Under the hood
Thu 22 Oct · 09:59
Today Tomorrow

Trains in window

09:59 🚆 2H81 Inverness → Kyle of Lochalsh Down (N → S) approaching
🚆Passenger
now 09:59:14 · 12 avg · 1 in window
live observation: 1 up · 3 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active · 31,698 delays · 1,962 cancelled · 9 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Strathcarron crossing is predicted to be closed for about 19 min between 06:00 and 22:00, across roughly 7 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:00–07:00 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the A890 in Strathcarron, Highland, next to the station.

Strathcarron is a automatic open level crossing with barriers crossing (AOCLB) on the Dingwall–Kyle of Lochalsh line (Scotland route · ELR KYL). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 27 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?