Thames Board Mills level crossing

Manually-controlled barrier level crossing on the Anglia route (ELR TLL).

predicted
OPEN
for 12 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš† in 15 min Β· running

Next 30 min

OPEN 10:00–10:12 12m
CLOSED 10:12–10:19 7m
MAY OPEN 10:19–10:20 47s
CLOSED 10:20–10:23 3m
OPEN 10:23–10:42 β†’ 19m
Under the hood
Thu 22 Oct Β· 10:00
Today Tomorrow

Trains in window

09:51 πŸš† 2R78 London Fenchurch Street β†’ Grays Down (W β†’ E) -1 min
09:55 πŸš† 2R85 Grays β†’ London Fenchurch Street Up (E β†’ W) passed
10:00 πŸš› 6M36 Purfleet Foster Yeoman FHH β†’ Acton T.C. Up (E β†’ W) no show
10:13 πŸš› 4L17 Northampton Gateway GBRf β†’ London Gateway GBRF Down (W β†’ E) no show
10:15 πŸš† 2R87 Grays β†’ London Fenchurch Street Up (E β†’ W) active
10:19 πŸš› 4M07 Tilbury2 Container Tml FL β†’ Daventry DRS (Tesco) Up (E β†’ W) active
10:23 πŸš† 2R80 London Fenchurch Street β†’ Grays Down (W β†’ E) on time
πŸš†Passenger πŸš›Freight
now 10:00:44 Β· 208 avg Β· 7 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,965 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Thames Board Mills crossing is predicted to be closed for about 5 h 35 min between 06:00 and 22:00, across roughly 74 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 9.8 min (07:09–07:19, 4 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:08–07:08 in the morning and around 18:51–19:51 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is in Purfleet-on-Thames, Essex.

Thames Board Mills is a manually-controlled barrier crossing (MCB/MB) on the Dagenham Down Yard–Purfleet Deep Wtr Whf (FLT) line (Anglia route · ELR TLL). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 890 trains through this crossing.

99.7% of observed passes were being warned about on this page when they passed, and 99.4% of the warnings we could verify came true.

Full accuracy report β†’

Is this right?