Automatic half-barrier level crossing on the North and East route (ELR TJG2).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 now · 3 min early

Next 30 min

CLOSED 17:38–17:40 1m
OPEN 17:40–18:00 20m
CLOSED 18:00–18:01 2m
OPEN 18:01–18:25 → 23m
Under the hood
Thu 08 Oct · 17:38
Today Tomorrow

Trains in window

17:38 🚄 1W49 Sheffield → Scarborough Down (SW → NE) -3 min
17:39 🚆 2C70 Hull → Doncaster Up (NE → SW) approaching
18:01 🚄 1J51 Scarborough → Sheffield Down (SW → NE) on time
🚄Express passenger 🚆Passenger
now 17:38:55 · 86 avg · 3 in window
live observation: 1 up · 3 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,673 active · 32,052 delays · 2,191 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Thorne Moorends crossing is predicted to be closed for about 2 h 30 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (05:54–05:55, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:38–08:38 in the morning and around 19:31–20:31 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Thorne Moorends is a automatic half-barrier crossing (AHB) on the Scunthorpe–Knottingley T.M.D. line (North and East route · ELR TJG2). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 241 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.8% of the warnings we could verify came true.

Full accuracy report →