Thorne No.1 level crossing

Automatic half-barrier level crossing on the East Coast route (ELR DOW).

predicted
CLOSED
for 1 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 now · 15 min early

Next 30 min

CLOSED 07:13–07:14 1m
OPEN 07:14–07:21 8m
CLOSED 07:21–07:22 1m
OPEN 07:22–07:31 8m
CLOSED 07:31–07:32 1m
OPEN 07:32–07:48 → 16m
Under the hood
Mon 07 Sep · 07:13
Today Tomorrow

Trains in window

07:11 🚛 6H61 Immingham Biomass LP (DBS)Drax Power Station Down (E → W) no show
07:12 🚛 6D64 Doncaster Down Decoy GBRFScunthorpe Anchor Up (W → E) active
07:13 🚃 4R48 Drax Power StationImmingham Biomass LP (DBS) Up (W → E) approaching
07:18 🚧 6D74 Doncaster Up DecoyScunthorpe Trent T.C. Up (W → E) sched
07:22 🚄 1B67 CleethorpesLiverpool Lime Street HL/ML Down (E → W) approaching
07:32 🚛 6M63 Scunthorpe Trent T.C.Hope (Earles Sidings) Down (E → W) +3 min
07:41 🚛 6H61 Immingham Biomass LP (DBS)Drax Power Station Down (E → W) no show
🚄Express passenger 🚃Empty stock 🚛Freight 🚧Engineering
now 07:13:05 · 106 avg · 7 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-09-06..2026-09-08
fetched 02:08:15
trust 49,152 active · 25,052 delays · 3,031 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Thorne No.1 crossing is predicted to be closed for about 2 h 22 min between 06:00 and 22:00, across roughly 61 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.5 min (07:00–07:04, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:30–07:30 in the morning and around 13:07–14:07 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Thorne No.1 is a automatic half-barrier crossing (AHB-X) on the Scunthorpe Trent T.C.–Knottingley T.M.D. line (East Coast route · ELR DOW). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 514 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.3% of the warnings we could verify came true.

Typical timing error was ±3s (9 in 10 within 65s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?