Thorne No.1 level crossing

Automatic half-barrier level crossing on the East Coast route (ELR DOW).

predicted
OPEN
for the next 30 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 30 min Β· scheduled

Next 30 min

OPEN 07:34–08:07 β†’ 34m
Under the hood
Mon 12 Oct Β· 07:34
Today Tomorrow

Trains in window

07:32 πŸš› 6M63 Scunthorpe Trent T.C. β†’ Hope (Earles Sidings) Down (E β†’ W) +3 min
07:41 πŸš› 6H61 Immingham Biomass LP (DBS) β†’ Drax Power Station Down (E β†’ W) no show
07:48 πŸšƒ 5B64 Sheffield β†’ Cleethorpes Up (W β†’ E) no show
07:50 πŸš„ 1B64 Manchester Airport β†’ Cleethorpes Up (W β†’ E) cancelled
08:04 πŸš› 6N31 Scunthorpe B.S.C.(Ent.C.) β†’ Lackenby B.S.C. Down (E β†’ W) sched
πŸš„Express passenger πŸšƒEmpty stock πŸš›Freight
now 07:34:07 Β· 103 avg Β· 5 in window
live observation: 1 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,802 active Β· 25,719 delays Β· 2,542 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Thorne No.1 crossing is predicted to be closed for about 2 h 21 min between 06:00 and 22:00, across roughly 60 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.3 min (01:23–01:26, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:30–07:30 in the morning and around 13:17–14:17 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Moor Road in Thorne, South Yorkshire.

Thorne No.1 is a automatic half-barrier crossing (AHB-X) on the Scunthorpe–Knottingley T.M.D. line (East Coast route · ELR DOW). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 520 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.3% of the warnings we could verify came true.

Typical timing error was Β±3s (9 in 10 within 22s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?