Thorne No.1 level crossing

Automatic half-barrier level crossing on the East Coast route (ELR DOW).

right now
OPEN
for 14s
next: 🚃 in 1 min · 16 min early

Next 30 min

OPEN 01:13–01:14 14s
CLOSED 01:14–01:15 2m
OPEN 01:15–02:28 → 73m
Under the hood
Fri 24 Jul · 01:13
Today Tomorrow

Trains in window

01:13 6H50 🚛 IMNGBIO → DRAXCEG ← from Scunthorpe B.S.C.(Ent.C.) -19 min
01:15 4R40 🚃 DRAXCEG → IMNGBIO → from Goole -16 min
01:18 6D10 🚛 PBROVGB → BNTBGBR → from Goole cancelled
🚃Empty stock 🚛Freight
now 01:13:53 · 133 avg · 3 in window
lx berths down: DR/0619→DR/[email protected] · up: DR/0618→DR/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,125 delays · 1,797 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Thorne No.1 crossing is predicted to be closed for about 2 h 33 min between 06:00 and 22:00, across roughly 58 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:18–00:20, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:52–07:52 in the morning and around 13:06–14:06 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Thorne No.1 is a automatic half-barrier crossing (AHB-X) on the Scunthorpe B.S.C.(Ent.C.)–Goole line (East Coast route · ELR DOW). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 6 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 95.7% of the warnings we could verify came true.

Typical timing error was ±42s (9 in 10 within 220s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?