User-worked with stop lights level crossing on the Western route (ELR MLN4).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 10:08 | π 2P09 | Penzance β Plymouth Up (W β E) | on time |
| 10:22 | π 1C11 | Bristol Temple Meads β Penzance Down (E β W) | cancelled |
| 10:30 | π 2C05 | Exeter St. David's β Penzance Down (E β W) | +34 min |
On todayβs timetable, Trenowin Upper crossing is predicted to be closed for about 1 h 44 min between 06:00 and 22:00, across roughly 54 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:57β09:57 in the morning and around 18:25β19:25 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is in Trenowin, Cornwall.
Trenowin Upper is a user-worked with stop lights crossing (UWCMSL) on the DownβSt. Erth line (Western route · ELR MLN4). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β