Two Mile Bottom level crossing

Automatic half-barrier level crossing on the Anglia route (ELR ETN).

predicted
OPEN
for 10 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 11 min · on time

Next 30 min

OPEN 17:18–17:28 10m
CLOSED 17:28–17:29 2m
OPEN 17:29–17:47 18m
CLOSED 17:47–17:48 → 2m
Under the hood
Thu 08 Oct · 17:18
Today Tomorrow

Trains in window

17:09 🚄 1K78 Stansted Airport → Norwich Down (NW → SE) +4 min
17:29 🚄 1M82 Norwich → Manchester Piccadilly Up (SE → NW) approaching
17:48 🚄 1K90 Cambridge → Norwich Down (NW → SE) on time
🚄Express passenger
now 17:18:26 · 80 avg · 3 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,650 active · 32,045 delays · 2,188 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Two Mile Bottom crossing is predicted to be closed for about 2 h 30 min between 06:00 and 22:00, across roughly 55 closures. The longest single predicted closure is 4 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.9 min (10:03–10:07, 2 trains), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:23–09:23 in the morning and around 17:42–18:42 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Two Mile Bottom is a automatic half-barrier crossing (AHB) on the Ely–Harling Road line (Anglia route · ELR ETN). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 355 trains through this crossing.

99.2% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?