Tygwyn level crossing

Automatic barrier locally monitored level crossing on the Wales route (ELR DJP).

predicted
OPEN
for 18 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚆 in 20 min · 6 min late

Next 30 min

OPEN 09:59–10:17 18m
CLOSED 10:17–10:19 2m
OPEN 10:19–10:24 6m
CLOSED 10:24–10:26 2m
OPEN 10:26–11:59+ 1h+
Under the hood
Thu 22 Oct · 09:59
Today Tomorrow

Trains in window

10:18 🚆 2I16 Pwllheli → Machynlleth Up (NE → SW) +6 min
10:26 🚆 2J03 Machynlleth → Pwllheli Down (SW → NE) on time
🚆Passenger
now 09:59:20 · 18 avg · 2 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,173 active · 31,698 delays · 1,962 cancelled · 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Tygwyn crossing is predicted to be closed for about 47 min between 06:00 and 22:00, across roughly 17 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (06:53–06:55, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:05–08:05 in the morning and around 18:18–19:18 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on the A496 in Ynys, Gwynedd, next to Tygwyn station.

Tygwyn is a automatic barrier locally monitored crossing (ABCL) on the Harlech–Porthmadog line (Wales route · ELR DJP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 105 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?