Automatic open level crossing with barriers level crossing on the Wales route (ELR DJP).
| No trains in the next 30 minutes. |
On today’s timetable, Bennar Fawr crossing is predicted to be closed for about 38 min between 06:00 and 22:00, across roughly 15 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 07:40–08:40 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Bennar Fawr is a automatic open level crossing with barriers crossing (AOCLB) on the Talybont–Porthmadog line (Wales route · ELR DJP). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →