Automatic barrier locally monitored level crossing on the Anglia route (ELR ESK).
| No trains in the next 30 minutes. |
On today’s timetable, Ufford crossing is predicted to be closed for about 1 h 15 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 09:36–10:36 in the morning and around 15:24–16:24 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
Ufford is a automatic barrier locally monitored crossing (ABCL) on the Woodbridge–Sizewell TCA line (Anglia route · ELR ESK). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →