User-worked with stop lights level crossing on the East Midlands route (ELR WEB).
Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.
| 09:56 | π 2K10 | Peterborough β Lincoln Down | +2 min |
| 10:03 | π 4L01 | Masborough F.D. β Felixstowe North EWS Up | no show |
| 10:14 | π 4E23 | Felixstowe North F.L.T. β Leeds F.L.T. Down | no show |
| 10:21 | π 2K07 | Lincoln β Peterborough Up | +1 min |
On todayβs timetable, Welland Bank crossing is predicted to be closed for about 56 min between 06:00 and 22:00, across roughly 31 closures. The longest single predicted closure is 1 minute. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.
Closures cluster around 08:55β09:55 in the morning and around 18:54β19:54 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.
The crossing is near Peakirk, Lincolnshire.
Welland Bank is a user-worked with stop lights crossing (UWCMSL) on the DownβUp line (East Midlands route · ELR WEB). Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.
Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β