Womersley level crossing

Manually-controlled barrier with obstacle detection level crossing on the North and East route (ELR KWS).

predicted
CLOSED
for 8 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 4 min · 3 min late

Next 30 min

CLOSED 16:56–17:04 8m
OPEN 17:04–17:09 4m
CLOSED 17:09–17:14 5m
OPEN 17:14–17:46 → 33m
Under the hood
Thu 08 Oct · 16:56
Today Tomorrow

Trains in window

16:54 🚄 1A67 Bradford Interchange → London Kings Cross Up (NW → SE) +6 min
17:00 🚛 6D12 Lackenby B.S.C. → Scunthorpe B.S.C.(Ent.C.) Up (NW → SE) +3 min
17:04 🚃 4R54 Drax Power Station → Immingham Biomass LP (DBS) Up (NW → SE) active
17:13 🚧 6G82 Neville Hill Up Sidings → Doncaster Up Decoy Up (NW → SE) +3 min
17:14 🚛 6D63 Sunderland Londonderry Sdg → Scunthorpe Trent T.C. Up (NW → SE) no show
🚄Express passenger 🚃Empty stock 🚛Freight 🚧Engineering
now 16:56:26 · 71 avg · 5 in window
timetable cif full+upd 2026-10-07..2026-10-09
fetched 02:08:26
trust 33,621 active · 32,043 delays · 2,175 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Womersley crossing is predicted to be closed for about 2 h 6 min between 06:00 and 22:00, across roughly 24 closures. The longest single predicted closure is 5 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:02–11:02 in the morning and around 16:52–17:52 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Womersley is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Doncaster West Yard–Knottingley T.M.D. line (North and East route · ELR KWS). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?