Wrenbury level crossing

Manually-controlled barrier with obstacle detection level crossing on the Wales route (ELR SYC).

predicted
OPEN
for 19 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 22 min · 7 min late

Next 30 min

OPEN 10:00–10:18 19m
CLOSED 10:18–10:22 3m
OPEN 10:22–10:29 7m
CLOSED 10:29–10:32 → 3m
Under the hood
Thu 22 Oct · 10:00
Today Tomorrow

Trains in window

10:21 🚄 1W14 Carmarthen → Manchester Piccadilly Down (SW → NE) +7 min
10:32 🚄 1V38 Manchester Piccadilly → Fishguard Harbour Up (NE → SW) +10 min
🚄Express passenger
now 10:00:01 · 78 avg · 2 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active · 31,699 delays · 1,963 cancelled · 9 reconnects
Nearby crossings

All 235 crossings in Wales & Western →

About this crossing

How often it closes

On today’s timetable, Wrenbury crossing is predicted to be closed for about 3 h 55 min between 06:00 and 22:00, across roughly 50 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 06:22–07:22 in the morning and around 12:33–13:33 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Wrenbury Road in Wrenbury, Cheshire, next to the station.

Wrenbury is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Shrewsbury–Nantwich line (Wales route · ELR SYC). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?