Arbroath level crossing

Manually-controlled barrier level crossing on the Scotland route (ELR ECN3).

predicted
OPEN
for 7 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚄 in 10 min · 1 min late

Next 30 min

OPEN 07:52–07:59 7m
CLOSED 07:59–08:02 4m
OPEN 08:02–08:19 16m
CLOSED 08:19–08:22 → 3m
Under the hood
Tue 06 Oct · 07:52
Today Tomorrow

Trains in window

07:44 🚄 1A29 Glasgow Queen St High Level → Aberdeen Down (S → N) +1 min
08:02 🚄 1B70 Inverness → Edinburgh Up (N → S) +1 min
08:02 🚄 1A01 Edinburgh → Aberdeen Down (S → N) on time
08:22 🚄 1T18 Aberdeen → Glasgow Queen St High Level Up (N → S) +1 min
🚄Express passenger
now 07:52:22 · 88 avg · 4 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,447 active · 31,734 delays · 1,721 cancelled · 0 reconnects
Nearby crossings

All 113 crossings in Scotland's Railway →

About this crossing

How often it closes

On today’s timetable, Arbroath crossing is predicted to be closed for about 4 h 25 min between 06:00 and 22:00, across roughly 60 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:31–11:31 in the morning and around 20:04–21:04 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Arbroath is a manually-controlled barrier crossing (MCB/MB) on the Dundee–Montrose line (Scotland route · ELR ECN3). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?