Auckley level crossing

Manually-controlled barrier with obstacle detection level crossing on the East Coast route (ELR SPD4).

predicted
OPEN
for 16 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš› in 20 min Β· 9 min late

Next 30 min

OPEN 06:00–06:16 16m
CLOSED 06:16–06:21 5m
OPEN 06:21–06:38 β†’ 17m
Under the hood
Wed 11 Nov Β· 06:00
Today Tomorrow

Trains in window

05:52 πŸš› 4E46 Felixstowe North EWS β†’ Wakefield Europort RFD Down (E β†’ W) no show
05:54 πŸš› 4E82 Felixstowe North F.L.T. β†’ Tinsley Intermodal Term Down (E β†’ W) +24 min
06:07 πŸš› 4L03 Doncaster Iport GBRF β†’ Felixstowe South GBRF Up (W β†’ E) no show
06:09 πŸš› 4E54 Felixstowe North F.L.T. β†’ Doncaster Europort Down (E β†’ W) no show
06:20 πŸš› 4E55 Felixstowe North F.L.T. β†’ Tees Dock Corus (FLT) Down (E β†’ W) +9 min
πŸš›Freight
now 06:00:45 Β· 111 avg Β· 5 in window
timetable cif full+upd 2026-11-10..2026-11-12
fetched 02:08:20
trust 32,677 active Β· 31,182 delays Β· 2,005 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Auckley crossing is predicted to be closed for about 1 h 31 min between 06:00 and 22:00, across roughly 18 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 07:36–08:36 in the morning and around 20:51–21:51 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Gate House Lane near Auckley, South Yorkshire.

Auckley is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Lincoln–Doncaster Down Decoy GBRF line (East Coast route · ELR SPD4). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?