Moat Hills level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR ECM1).

predicted
CLOSED
for 7 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 3 min Β· 2 min late

Next 30 min

CLOSED 09:59–10:06 7m
OPEN 10:06–10:12 6m
CLOSED 10:12–10:16 3m
OPEN 10:16–10:26 11m
CLOSED 10:26–10:29 β†’ 3m
Under the hood
Thu 22 Oct Β· 09:59
Today Tomorrow

Trains in window

09:52 πŸš„ 1Y09 Newcastle β†’ London Kings Cross Up (N β†’ S) +3 min
09:55 🚧 6N06 Doncaster Up Decoy β†’ York Engineers Yard Down (S β†’ N) +8 min
09:57 πŸš„ 1V85 Newcastle β†’ Reading Up (N β†’ S) +1 min
09:59 πŸš„ 1S08 London Kings Cross β†’ Edinburgh Down (S β†’ N) +1 min
10:02 πŸš„ 1E79 Reading β†’ Newcastle Down (S β†’ N) +2 min
10:06 πŸš„ 1N03 London Kings Cross β†’ Newcastle Down (S β†’ N) -2 min
10:07 πŸš› 4E02 Hope (Earles Sidings) FHH β†’ Drax AES Down (S β†’ N) cancelled
10:15 πŸš„ 1E05 Edinburgh β†’ London Kings Cross Up (N β†’ S) on time
10:29 πŸš„ 1A61 Sunderland β†’ London Kings Cross Up (N β†’ S) +3 min
πŸš„Express passenger πŸš›Freight 🚧Engineering
now 09:59:42 Β· 249 avg Β· 9 in window
timetable cif full+upd 2026-10-21..2026-10-23
fetched 02:08:22
trust 33,174 active Β· 31,699 delays Β· 1,963 cancelled Β· 9 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Moat Hills crossing is predicted to be closed for about 9 h 31 min between 06:00 and 22:00, across roughly 105 closures. The longest single predicted closure is 14 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:05–09:05 in the morning and around 17:32–18:32 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Ings Road in Doncaster, South Yorkshire.

Moat Hills is a CCTV-monitored manual barrier crossing (CCTV) on the Doncaster–Shaftholme Junction line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure β†’

Is this right?