Thorpe Road level crossing

Automatic half-barrier level crossing on the East Coast route (ELR CJS).

right now
OPEN
for 17 min
next: 🚛 in 18 min · 19 min early

Next 30 min

OPEN 01:12–01:29 17m
CLOSED 01:29–01:30 2m
OPEN 01:30–02:42 → 72m
Under the hood
Fri 24 Jul · 01:12
Today Tomorrow

Trains in window

01:13 6D10 🚛 PBROVGB → BNTBGBR → from Knottingley T.M.D. cancelled
01:30 6H50 🚛 IMNGBIO → DRAXCEG ← from Scunthorpe B.S.C.(Ent.C.) -19 min
🚛Freight
now 01:12:35 · 218 avg · 2 in window
lx berths down: DR/0643→DR/[email protected] · down: DR/0717→DR/[email protected] · up: DR/0662→DR/[email protected] · up: DR/0726→DR/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,086 active · 30,124 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Thorpe Road crossing is predicted to be closed for about 4 h 27 min between 06:00 and 22:00, across roughly 94 closures. The longest single predicted closure is 6 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:26–00:27, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:11–09:11 in the morning and around 13:10–14:10 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Thorpe Road is a automatic half-barrier crossing (AHB) on the Scunthorpe B.S.C.(Ent.C.)–Knottingley T.M.D. line (East Coast route · ELR CJS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 815 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.5% of the warnings we could verify came true.

Typical timing error was ±28s (9 in 10 within 87s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →

Is this right?