Thorpe Road level crossing

Automatic half-barrier level crossing on the East Coast route (ELR CJS).

predicted
OPEN
for 19 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚃 in 21 min · running

Next 30 min

OPEN 10:40–10:59 19m
CLOSED 10:59–11:01 2m
OPEN 11:01–12:40+ 1h+
Under the hood
Sat 17 Oct · 10:40
Today Tomorrow

Trains in window

11:01 🚃 4R50 Drax Power Station → Immingham Biomass LP (DBS) Up (W → E) active
🚃Empty stock
now 10:40:28 · 33 avg · 1 in window
live observation: 1 up · 1 down
timetable cif full+upd 2026-10-16..2026-10-18
fetched 02:08:22
trust 42,266 active · 37,493 delays · 2,905 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Thorpe Road crossing is predicted to be closed for about 9 min between 06:00 and 22:00, across roughly 3 closures. The longest single predicted closure is 2 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 1.5 min (00:00–00:01, 1 train), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 06:21–07:21 in the morning and around 14:57–15:57 in the afternoon. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Thorpe Bank near Barnby Dun, South Yorkshire.

Thorpe Road is a automatic half-barrier crossing (AHB) on the Scunthorpe–Knottingley T.M.D. line (East Coast route · ELR CJS). The approaching train itself triggers the closure at a fixed point on its approach. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 184 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 99.0% of the warnings we could verify came true.

Full accuracy report →

Is this right?