right now
OPEN
for 2 min
next: 🚄 in 5 min · 9 min early

Next 30 min

OPEN 01:13–01:15 2m
CLOSED 01:15–01:21 6m
OPEN 01:21–02:12 → 51m
Under the hood
Fri 24 Jul · 01:13
Today Tomorrow

Trains in window

01:04 4S73 🚛 MBROSTY → MOSEDNY ← from Doncaster West Yard no show
01:18 1N35 🚄 KNGX → YORK ← from Doncaster West Yard -9 min
01:21 6E36 🚛 MLRHY → DONCUDY → from Heck (FLHH) -12 min
01:26 6V90 🚛 DRAXCEG → APPLEFS → from Heck (FLHH) no show
🚄Express passenger 🚛Freight
now 01:13:08 · 238 avg · 4 in window
lx berths down: DR/0813→DR/[email protected] · up: DR/0822→DR/[email protected]
timetable cif full+upd 2026-07-22..2026-07-24
fetched 23:44:56
trust 33,087 active · 30,125 delays · 1,796 cancelled · 0 reconnects
Nearby crossings

All 867 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Daw Lane crossing is predicted to be closed for about 9 h 11 min between 06:00 and 22:00, across roughly 84 closures. The longest single predicted closure is 15 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 3.2 min (00:23–00:26, 1 train), timed from trains actually seen on the signalling wire — the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 07:13–08:13 in the morning and around 13:05–14:05 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Daw Lane is a cctv-monitored manual barrier crossing (CCTV) on the Doncaster West Yard–Heck (FLHH) line (East Coast route · ELR ECM1). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway — over the last 7 days that covered 12 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 100.0% of the warnings we could verify came true.

Typical timing error was ±41s (9 in 10 within 86s). This scores when trains pass — barrier movements aren't in the public feeds we can score against.

Full accuracy report →