Haywood level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR KWS).

predicted
OPEN
for the next 30 min

Information only — always follow the signals and barriers at the crossing. Predictions may be wrong.

Next 30 min

OPEN 07:15–08:01 → 46m
Under the hood
Tue 06 Oct · 07:15
Today Tomorrow

Trains in window

07:06 🚛 6E25 Dowlow Quarry FLHH → Heck Down (SE → NW) no show
07:28 🚛 6H61 Immingham Biomass LP (DBS) → Drax Power Station Down (SE → NW) no show
🚛Freight
now 07:15:14 · 68 avg · 2 in window
timetable cif full+upd 2026-10-05..2026-10-07
fetched 02:08:18
trust 33,384 active · 31,697 delays · 1,699 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Haywood crossing is predicted to be closed for about 1 h 40 min between 06:00 and 22:00, across roughly 19 closures. The longest single predicted closure is 8 minutes. Freight paths scheduled “as required” — most don’t run on any given day — aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 10:01–11:01 in the morning and around 20:21–21:21 in the evening. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

Haywood is a cctv-monitored manual barrier crossing (CCTV) on the Doncaster West Yard–Knottingley T.M.D. line (East Coast route · ELR KWS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight — though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?