Askern level crossing

CCTV-monitored manual barrier level crossing on the East Coast route (ELR KWS).

predicted
OPEN
for 30s

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: 🚛 in 5 min · on time

Next 30 min

OPEN 01:52–01:52 30s
CLOSED 01:52–01:57 5m
OPEN 01:57–03:52+ 1h+
Under the hood
Fri 13 Nov · 01:52
Today Tomorrow

Trains in window

01:57 🚛 6H50 Immingham Biomass LP (DBS) → Drax Power Station Down (SE → NW) on time
02:07 🚃 4B45 Drax Power Station → Immingham Biomass LP (DBS) Up (NW → SE) no show
🚃Empty stock 🚛Freight
now 01:52:11 · 81 avg · 2 in window
timetable cif full+upd 2026-11-11..2026-11-13
fetched 02:08:16
trust 33,903 active · 31,402 delays · 2,609 cancelled · 0 reconnects
Nearby crossings

All 866 crossings in Eastern →

About this crossing

How often it closes

On today’s timetable, Askern crossing is predicted to be closed for about 2 h 8 min between 06:00 and 22:00, across roughly 24 closures. The longest single predicted closure is 7 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Worst times to cross today

Closures cluster around 08:11–09:11 in the morning and around 12:00–13:00 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Station Road in Askern, South Yorkshire.

Askern is a CCTV-monitored manual barrier crossing (CCTV) on the Doncaster West Yard–Knottingley T.M.D. line (East Coast route · ELR KWS). A signaller monitors the crossing, confirms it is clear, and lowers the barriers ahead of each train. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

Our accuracy measurement doesn't cover this crossing yet. Reports from people at the crossing are the ground truth here. How we measure →

Is this right?