Manually-controlled barrier with obstacle detection level crossing on the East Coast route (ELR ECM2).

predicted
CLOSED
for 3 min

Information only. Always follow the signals and barriers at the crossing. Predictions may be wrong.

next: πŸš„ in 1 min Β· 2 min late

Next 30 min

CLOSED 07:46–07:49 3m
OPEN 07:49–07:57 8m
CLOSED 07:57–08:00 3m
OPEN 08:00–08:09 9m
CLOSED 08:09–08:12 3m
OPEN 08:12–08:17 β†’ 5m
Under the hood
Mon 12 Oct Β· 07:46
Today Tomorrow

Trains in window

07:37 πŸš„ 1V83 Newcastle β†’ Reading Up (N β†’ S) no show
07:47 πŸš„ 1Y06 Newcastle β†’ London Kings Cross Up (N β†’ S) +2 min
07:49 πŸš„ 1S03 London Kings Cross β†’ Aberdeen Down (S β†’ N) approaching
07:49 πŸš„ 1A09 Hull β†’ London Kings Cross Up (N β†’ S) on time
07:53 πŸšƒ 5Z05 York β†’ Doncaster Carr IEP Depot Up (N β†’ S) no show
08:00 πŸš„ 1S04 London Kings Cross β†’ Edinburgh Down (S β†’ N) -2 min
08:12 πŸš„ 1E01 Edinburgh β†’ London Kings Cross Up (N β†’ S) +1 min
08:12 πŸš„ 1N01 London Kings Cross β†’ Newcastle Down (S β†’ N) on time
πŸš„Express passenger πŸšƒEmpty stock
now 07:46:24 Β· 204 avg Β· 8 in window
live observation: 0 up Β· 1 down
timetable cif full+upd 2026-10-11..2026-10-13
fetched 02:08:22
trust 48,859 active Β· 26,043 delays Β· 2,563 cancelled Β· 0 reconnects
Nearby crossings

All 866 crossings in Eastern β†’

About this crossing

How often it closes

On today’s timetable, Moss crossing is predicted to be closed for about 9 h 28 min between 06:00 and 22:00, across roughly 87 closures. The longest single predicted closure is 23 minutes. Freight paths scheduled “as required” (most don’t run on any given day) aren’t counted here; when one does run, the live timeline above shows it.

Longest closure so far today: 6.0 min (05:22–05:28, 2 trains), timed from trains actually seen on the signalling wire: the window edges use the same per-type margins as the forecast, since barrier positions aren't in any feed we can read.

Worst times to cross today

Closures cluster around 08:38–09:38 in the morning and around 13:52–14:52 in the middle of the day. Gaps between closures are longest outside those windows. Other days run a different timetable, so the peaks move.

About this crossing

The crossing is on Moss Road near Moss, South Yorkshire.

Moss is a manually-controlled barrier with obstacle detection crossing (MCBOD) on the Doncaster West Yard–Selby line (East Coast route · ELR ECM2). An obstacle-detection system scans the crossing and confirms it is clear before the barriers lower automatically. Forecasts here combine the working timetable with live train-movement data (and live signalling where the crossing has it), so they reflect actual running including delays and freight, though they can still be wrong when the network is disrupted.

How accurate is this forecast?

We score this page against what actually happened on the railway: over the last 7 days that covered 656 trains through this crossing.

100.0% of observed passes were being warned about on this page when they passed, and 98.1% of the warnings we could verify came true.

Typical timing error was Β±1s (9 in 10 within 5s). This scores when trains pass: barrier movements aren't in the public feeds we can score against.

Full accuracy report β†’

Is this right?